| Y/M | Project | Description | Developer |
| 17-11 | Jaysonville | Design, Supply & Installation of Glass Balustrade | SHKP |
| 17-11 | The Parkville | Steel & Metal Works | NWD |
| 17-10 | Fleur Pavilia | Steel & Metal Works at Podium | NWD |
| 17-09 | No.26 Nathan Road | Structural Steel Work to Mall | SHKP |
| 17-07 | Artisan House | Steel & Metal Works | NWD |
| 17-06 | We Go Mall | Steel & Metal Works | Paliburg & Regal |
| 17-06 | No.8-10 Wong Chuk Hang Road | Temporary Steel & Metal Works | Swire & CMB |
| 17-05 | No.33 Tseuk Luk Street | Design, Supply & Installation of Aluminium Cladding, Grille and Louvre at Podium and Tower | SHKP |
| 17-05 | The Wings Ph 1 | Design, Supply & Installation of Shop Front at G/F & 1/F | SHKP |
| 17-05 | Cullinan West | Design, Supply & Installation of Covered Walkway, Aluminium & Cladding at Towers & Podium | SHKP |
| 17-04 | Twin Regency | Aluminium Metal Works | SHKP |
| 17-03 | H. Bonaire | Metal & Glass Balustrade | HLD |
| 17-03 | Cathay Pacific City Ph 2 | Metal & Stainless Steel Works | Cathay |
| 17-02 | Victoria Harbour | Aluminium Cladding at Exterior Wall & Aluminium Balustrade at Balcony | SHKP |
| 17-02 | Data Centre | Steel & Metal Works | SUNeVision |
| 17-01 | Ori | Modification and Removal of ELS, Sheet Pipe and Temporary Steel Platform | Nan Fung |
| 17-01 | Cullinan West | Design, Supply and Installation of Aluminium False Ceiling at Balcony | SHKP |
| 17-01 | Ocean Wings | Design, Supply and Installation of Aluminium Grille to A/C Platform and Cladding to Pipe Duct | SHKP |
| 16-12 | Alto Residences | Temporary Steel & Metal Works | Lai Sun & Empire |
| 16-12 | Victoria Harbour | Aluminium Cladding at Exterior Wall & Aluminium Balustrade at Balcony | SHKP |
| 16-11 | Cullinan West | Temporary Steel & Metal Works at Upper & Lower Floor of Tower | SHKP |
| 16-10 | TKO Plaza | Temporary Steel & Metal Works at B1-G/F of Shopping Centre Phase 1 | SHKP |
| 16-08 | Twin Regency | Design Supply and Installation of Glass Balustrade, Aluminium Railing & Cladding | SHKP |
| 16-07 | Ocean Wings | External Fence Wall & Balustrade Embed Works | SHKP |
| 16-06 | Century Link | Temporary Structural Hoarding & Steel Container Works | SHKP |
| 16-06 | Data Centre | Transformer Room Metal Works | SUNeVision |
| 16-05 | Mount Pavilia | Design, Supply & Installation of Glass Balustrade, Aluminium Railing & Cladding | NWD |
| 16-04 | Cathay Pacific City Ph 2 | Metal & Stainless Steel Works | Cathay |
| 16-01 | Jaysonville | Design, Supply & Installation of Glass Balustrade | SHKP |
| 16-01 | Mount Pavilia | Steel and Metal Works | NWD |
| 15-11 | Big Star Centre | Supply & Installation of Fire-rated Board | HLD |
| 15-11 | Ori | Modification and Removal of ELS, Sheet Pipe and Temporary Steel Platform | Nan Fung |
| 15-08 | H. Bonaire | Metal & Glass Balustrade Works | HLD |
| 15-07 | Imperial Kennedy | Landscape Metal Works | SHKP |
| 15-07 | Twin Regency | Design Supply and Installation of Glass Balustrade, Aluminium Railing & Cladding | SHKP |
| 15-07 | Parker33 | Steel & Metal Works | HLD |
| 15-06 | The Pavilia Hill | Metal & Stainless Steel Works | NWD |
| 15-05 | Yoho Mall | Design, Supply & Installation of Winch System at Mall Area | SHKP |
| 15-05 | Yoho Midtown | Steel & Metal Works to T1-T5 & T8-T10 | SHKP |
| 14-10 | i·UniQ | Excavation, Shoring and Strutting Work | SHKP |
| 14-09 | Ultima | Characteristic Unit Metal Works & Kitchen Ceiling Metal Rack | SHKP |
| 14-08 | The Wings Ph 3 | External Excavation, Shoring and Strutting Works & Sheet Piles Cutting | SHKP |
| 14-08 | The Visionary | Supply and Installation of Steel & Metal Works and Timber Works at Landscape and Podium | Nan Fung |
| 14-06 | Century Link | Temporary Steel & Metal Works (Podium & Tower) | SHKP |
| 14-04 | Tsuen Wan Town Square Ph 1 | Renovation Works at Exterior Wall of Shopping Mall | HLD |
| 14-03 | Mount Pavilia | Temporary Steel Bridge | NWD |
| 14-03 | Heya Aqua | Temporary Steel & Metal Works | HS |
| 14-02 | Yoho Mall | Improvement Works of Cycle Tracks and Footpaths | SHKP |
| 14-01 | Park Vista 1A | Supply & Installation of Glass Balustrade, Aluminium Louvers, Grilles and Cladding to Podium | SHKP |
| 14-01 | The Woodside | Design, Supply & Installation of Glass Balustrade/Metal Balustrade/Aluminium Grille Works | NWD |
| 14-01 | Yoho Midtown | Temporary Steel & Metal Works from T8 to T10 | SHKP |
| 13-12 | High One Grand | Glass & Metal Balustrade Works | HLD |
| 13-11 | High Park Grand | Glass Balustrade Works | HLD |
| 13-11 | Deauvilie | Steel & Metal Works at Exterior Fence and Tower | SHKP |
| 13-10 | The Reach | Design, Supply & Installation of Glass, Metal & Aluminium Balustrade Works | HLD |
| 13-09 | The Wings Ph 3 | Temporary Steel & Metal Works | SHKP |
| 13-08 | Nan Fung Tower | LG/F - 5/F Erection and Removal of Hoarding Works | Nan Fung |
| 13-07 | Ultima | Permanent Steel & Metal Works | SHKP |
| 13-06 | Park Island | Structural Steel Works at Ceramic Hall & Butterfly House in Solar Tower & Soil Excavation Works | SHKP |
| 13-06 | The Golden Gate | Steel & Metal Works at Tower | Chinachem |
| 13-06 | Imperial Kennedy | Concreting Works & Power Float Concrete (Tower & Podium) | SHKP |
| 13-05 | Double Cove | Steel & Metal Works at Tower & Podium of Ph 2 & 3 | HLD & HS |
| 13-04 | The Reach | Supply & Installation of Metal Stairs at Clubhouse | HLD |
| 13-02 | One Harbour Square | Soil Dredging & Backfilling Works for Replacement Works of Government Storm Drain at Tsun Yip Street | SHKP |
| 13-01 | Green Code | Supply & Installation of Glass & Metal Balustrade Works | HLD |
| 13-01 | The Woodsville | Design, Supply & Installation of Glass/Metal/Aluminium Balustrade Works | HS |
| 12-10 | Imperial Kennedy | Excavation, Shoring and Strutting Works | SHKP |
| 12-08 | Riva | Metal Frame Works at Lobby, Mall Toilet and Clubhouse | SHKP |
| 12-07 | Yuen Long Centre | Structural Steel Works at No.2 Footbridge | SHKP |
| 12-06 | Park Villa | Aluminium Cladding/Fin/Windproof Ceiling & Glass Balustrade Works | NWD |
| 12-05 | Cullinan West | Covered Walkway & Structural Hoarding Works(stage 2 -Phase 1B) | SHKP & MTR |
| 12-05 | APM | Structural Steel Framework at L2 | SHKP |
| 12-05 | Valais | Formation Works at Site 2 | SHKP |
| 12-05 | Hotel Indigo (HK) | Structural Stairs, Glass Stairs & Glass Balustrade Works | NWD |
| 12-05 | Providence Bay | Design, Supply and Installation of Glass Panel and Glass Balustrade | Sino |
| 12-04 | i.UniQ | Design, Supply and Installation of Glass Balustrade & Aluminium Railing | SHKP |
| 12-04 | Century Gateway | Supply & Installation of Exterior Wall Aluminium Cladding | SHKP |
| 12-03 | Park Vista 1A | Temporary Loading Platform | SHKP |
| 12-03 | Providence Bay | Steel & Metal Works | Sino |
| 12-02 | Imperial Cullinan | Metal Works at Barrier & Drainage Wells | SHKP |
| 12-02 | Imperial Cullinan | Glass Balustrade w Aluminium Cladding & Metal Balustrade Works | SHKP |
| 11-12 | Grand Century Place | Temporary Metal Platform at L1-L2 | SHKP |
| 11-12 | One Regent Place | Permanent Steel & Metal Works | SHKP |
| 11-11 | Shouson Peak | Permanent Steel & Metal Works | SHKP |
| 11-10 | The Golden Gate | Structural Hoarding & Metal Gate Works | Chinachem |
| 11-10 | MacPherson Stadium | Supply of Stainless Steel & Galvanized Steel (Embed) Works | NWD |
| 11-10 | Kowloon Commerce Centre | Temporary Structural Steel Framework (Catch Fan) at L8 & L21 of Phase 2 | SHKP |
| 11-10 | APM | Metal Framework for 1/F LED TV | SHKP |
| 11-09 | The Wings | Steel & Metal Works at Hotel Zone | SHKP |
| 11-07 | Twelve Peaks | Barrier and Steel & Metal Works at Tower | SHKP |
| 11-06 | Avignon | Steel & Metal Works | SHKP |
| 11-06 | One Regent Place | Fire-rated Board | SHKP |
| 11-05 | Larvotto | Supply of Channel cover at EVA & Pavement | SHKP |
| 11-04 | Elite Centre | Excavation, Shoring and Strutting Works | SHKP |
| 11-02 | Chatham Gate | Concreting Works at Tower & Podium | SHKP |
| 10-12 | Twelve Peaks | Concreting Works | SHKP |
| 10-11 | The Wings | Glass Wall and Cladding at Podium of Hotel | SHKP |
| 10-08 | La Verte | Glass Balustrade | HLD |
| 10-06 | Seascape Villa | Structural Steel Works & Glass Balustrade at Tower | SHKP |
| 10-05 | The Latitude | Metal Works at Podium | SHKP |
| 10-03 | Park Island | Supply & Installation of Aluminium Grille to Clubhouse | SHKP |
| 10-02 | Double Cove | Structural Hoarding Works | HLD |
| 10-01 | The Hermitage | Glass and metal balustrade S.S. channel cover | Sino & Nan Fung |
| 09-12 | The Parcville | Temporary Steel & Metal Works | SHKP |
| 09-11 | Yoho Midtown | Steel & Metal Works | SHKP |
| 09-09 | No.11-12 Headland Road | Louver & Glass Balustrade & Aluminium Fins & Auto Gate Works | HLD |
| 09-06 | The Wings | Temporary Steel & Metal Works | SHKP |
| 09-03 | Aria Kowloon Peak | Temporary Steel & Metal Works | SHKP |
| 09-03 | Severn 8 | Concreting Works | SHKP |
| 09-03 | New Town Plaza | Structural Steel Works for Exterior Signboard at Phase2 | SHKP |
| 09-01 | The Vineyard | Glass Balustrade Works | SHKP |
| 09-01 | Double Cove | Excavation Works | HLD |
| 08-10 | Sky One | Steel & Metal Works | SHKP |
| 08-08 | Avignon | Cutting H-shape Piles Works | SHKP |
| 08-07 | 39 Conduit Road | Steel & Metal Works at Transformer Room & External Tower | HLD |
| 08-07 | Manhattan Hill | Aluminium Louvre & Aluminium Cladding Works | SHKP |
| 08-07 | ICC | Installation of Metal Platform, H-shape Frame & Vibration Isolator Works at 3/F - 85/F | SHKP |
| 08-04 | W Hotel (HK) | Landscape Deck Works at swimming pool on 76/F | SHKP |
| 08-04 | World Trade Centre | Structural H-shape Steel Works at Phase 2 | SHKP |
| 08-03 | ICC | Supply & Installation of Brick Wall Wind Post Works from R3/F to M3-2/F | SHKP |
| 08-02 | The Beverly Hills | Metal Fence & Glass Balustrade Works | HLD |
| 08-01 | Spectacle | Glass & Metal Balustrade Works at Tower | HLD |
| 08-01 | Sky One | Aluminium Cladding & Glass Balustrade Works | SHKP |
| 07-12 | Park Island Ph 5 | Steel & Metal Works | SHKP |
| 07-12 | La Place De Victoria | Steel & Metal Works at Tower | Nan Fung |
| 07-11 | Sky One | Stainless Steel Frame Works at Exterior Wall | SHKP |
| 07-09 | ESF Primary School | Installation of Main Gate | Chevalier |
| 07-09 | Beacon Lodge | Decorative Louvre at Exterior Wall (VO) | SHKP |
| 07-07 | Tsuen Wan Plaza | Glass Balustrade Works | SHKP |
| 07-07 | ICC | Glass Balustrade Works | SHKP |
| 07-06 | Florient Rise | Temporary Steel & Metal Works | Nan Fung |
| 07-04 | CITE 33 | Supply & Installation of Stainless Steel & Metal | HLD |
| 07-03 | HKCC West Kowloon Campus | Supply & Installation of Galvanized Steel Flashing at Edge of Stairs | Chevalier |
| 07-01 | La Maison Vineyard | Steel & Metal Works | SHKP |
| 06-12 | Manhattan Hill | Aluminium Features w Wooden Pattern & Metal Door Works | SHKP |
| 06-11 | ICC | Shoring & Strutting at Basement B | SHKP |
| 06-11 | The Sherwood | Additional External Fence | HLD |
| 06-10 | Royal View Hotel | Supply & Installation of Grilles and Roof Features & Aluminium Louvre | SHKP |
| 06-10 | Grand Waterfront | Steel & Metal Works at Town Gas South Factory | HLD |
| 06-07 | Manhattan Hill | Aluminium Cladding Works at Balcony of Tower | SHKP |
| 06-06 | La Maison Vineyard | Steel & Metal Works | SHKP |
| 06-04 | Yuen Long Primary School Zone 12 | Supply & Installation of Fiber Gully Cover & Transformer Room Metal Works | Chevalier |
| 06-02 | Uptown Plaza | Structural Steel & Metal Works for Exterior Wall Billboard | SHKP |
| 05-12 | Manhattan Hill | Aluminium Cladding Works at Balcony of Tower | SHKP |
| 05-12 | East Point City | Fire rated Ceiling at Corridor | SHKP |
| 05-11 | MTR Tung Chung Station | Steel & Metal Door Works | HLD |
| 05-10 | Palatial Coast | Repairing & Surfacing Works to Asphalt Road | SHKP |
| 05-09 | Serven 8 | Metal Works | SHKP |
| 05-08 | Harbour Green | Design Supply and Installation of Glass Balustrade Works | SHKP |
| 05-08 | Metroplaza | Glass Balustrade Works at East Wing on L5 | SHKP |
| 05-06 | Park Central | Glass & Stainless Steel Balustrade Works | SHKP |
| 05-06 | 18 Farm Road | Steel & Metal Works | SHKP |
| 05-04 | Tsuen Wan Plaza | Temporary Steel & Metal Works at Pedestrian Passage | SHKP |
| 04-11 | Harbour Green | Supply & Installation of Stainless Steel Door & Exterior Wall Metal Works | SHKP |
| 04-10 | Manhattan Hill | Transformer Room Metal Works | SHKP |
| 04-09 | TKO Plaza | Design, Supply & Installation of Glass Balustrade Works | Nan Fung |
| 04-08 | Park Island Ph 3 | Metal Door Works at Tower Rooftop | SHKP |
| 04-07 | Sham Wan Towers | Steel & Metal Works at Tower | SHKP |
| 04-04 | Grand Promenade | Temporary Steel & Metal Works | HLD & TG |
| 04-02 | The Cullinan | Supply & Installation of Metal Framework at Podium Clubhouse | SHKP |
| 03-11 | Kin On Concrete Factory | Repairing Metal Works at External Area | SHKP |
| 03-09 | CITE 33 | Design, Supply & Installation of Glass Wall/Window & Glass Balustrade | HLD |
| 03-08 | TKO Plaza | Steel & Metal Works at Tower | Nan Fung |
| 03-06 | Liberte | Metal Frame for Brick Wall & Exterior Wall at Podium | SHKP |
| 03-06 | Park Island Ph 2 | Installation of Stainless Steel Gutter at Bus Stop of Toll Area | SHKP |
| 03-03 | The Arch | Metal Frame for Marble at Lift Lobby & Bathroom | SHKP |
| 03-01 | The Cullinan | Temporary Fire Rated Board at B/F-L/F | SHKP |
| 02-12 | TKO Plaza | Stainless Steel & Glass Balustrade Works at L1&L2 | Nan Fung |
| 02-11 | Harbour Place | Additional Structural Hoarding Works | NWD & Wai Kee |
| 02-09 | Leighton Hill | Steel & Metal Balustrade Works | SHKP |
| 02-04 | Prima Villa | Metal Works of Tower, Podium & Carpark | SHKP |
| 02-02 | The Cullinan | Supply and installation of Cast-in Embed at Podium | SHKP |
| 01-12 | TKO Plaza | Supply and installation of Temporary Sharing & Strutting Works | Nan Fung |
| 01-11 | The Arch | Structural Steel Frame Work at Rooftop of Tower | SHKP |
| 01-08 | Prima Villa | Fire Rated Board at Tower & Podium | SHKP |
| 01-04 | The Belcher's | Steel & Metal Works at External Area & Tower | SHKP |
| 00-11 | Corinthia By The Sea | Stainless Steel Handrail of Metal Balustrade at Main Entrance of Shopping Mall and Cat Ladder at Podium | Jet Union |
| 00-09 | Prima Villa | Replacement Works of Drain Pipe w Road Repairing | SHKP |
| 00-05 | Prima Villa | Concerting Works at Green Area | SHKP |